Universal Optimizer
Maximize Total Income Volume and perfectly budget your Global Upgrades.
$
Leek Production
Product Refining
Base
Multiplier Core
Happy Customers
Has "No Ads!"
Simulation Depth
0.0%
Total Income Volume (IPS)
0.00x
Quantum Leek
Coins
Invested0
Auto-Synced
Core Upgrades Split
Leek ProductionLvl 0
Factory
ProductionLvl
0
Product RefiningLvl 0
Happy CustomersLvl 0
Global Logistics (Capped)
Global Belt Speed
Lvl 0
Global Grab Speed
Lvl 0
Base Inventory Actions
| Item | Base Pool | Refiner |
|---|
Factory & Box Optimizer
Sync Box Capacities & Calculate Local Logistics Budgets perfectly.
Goal Configuration
Lvl
Set higher for faster responsiveness. Local logistics will calculate the required cost to match.
Current Global State
Required Local Upgrades
Local Grab
Speed Needed
Lvl 0
$0
Local Belt
Speed Needed
Lvl 0
$0
Total Local
Investment
$0
Calculated Level Synchronization
| Production Stage | Factory Level | Box Level | Box Flow Rate | Item Flow (Req vs Act) |
|---|